Report to the S.C. Mental Health Commission on the progress of the project. Mentions that the two buildings will be of the same design as Buildings B & C (Saunders & Cooper). These buildings have longer rear wings than Allan and Preston, giving them…
Construction contract and technical specifications for two Maximum Detention Buildings at the State Park campus for African American patients. Includes comprehensive list of materials and construction standards.
Lafaye reports on the construction of the Maximum Detention Buildings. This was the first project funded by the emergency appropriation from the General Assembly.
The commission reports on building progress at the hospital. The maximum detention buildings are under construction, and the commission calls them the "latest in modern design" and a "credit to the institution."
Photograph of the white-washed brick extension of the Bakery where flour and bread were stored. An awning has been placed over the door to the storage room's entrance.