Browse Items (589 total)

Simmons.00001565.jpg
Photograph of an old laundry mangle, no longer in use.

Simmons.00001540.jpg
Photograph of the South entrance to the Laundry building and awning.

Simmons.00001491.jpg
Photograph of the gate and stairs that leads up to the Laundry building's portico.

Fite.039C.pdf
Report to the S.C. Mental Health Commission on the progress of the project. Mentions that the two buildings will be of the same design as Buildings B & C (Saunders & Cooper). These buildings have longer rear wings than Allan and Preston, giving them…

Fite.038C.pdf
Construction contract and technical specifications for two Maximum Detention Buildings at the State Park campus for African American patients. Includes comprehensive list of materials and construction standards.

Fite.037C.pdf
Lafaye reports on the construction of the Maximum Detention Buildings. This was the first project funded by the emergency appropriation from the General Assembly.

Simmons.00001473.jpg
Photograph of the portico of the Laundry building. A sliding entryway on the back wall allowed for easier access for receiving dirty laundry.

Fite.036C.pdf
The commission reports on building progress at the hospital. The maximum detention buildings are under construction, and the commission calls them the "latest in modern design" and a "credit to the institution."

Simmons.00001468.jpg
Photogrpah of the Bakery. View from the corner of the white-washed brick extension.

Simmons.00001460.jpg
Photograph of the white-washed brick extension of the Bakery where flour and bread were stored. An awning has been placed over the door to the storage room's entrance.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2