Browse Items (2 total)

Fite.047C.pdf
The hospital reports the renovation of Talley and Thompson and the demolition of the Taylor Building. The renovated buildings accepted female patients from various wards.

Fite.017C.pdf
This is a section from a 1949 engineering survey by an outside firm. The report identifies the Talley Building as overcrowded, unsafe, and completely unsuited for the specialized care of high risk patients.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2