"To replace the kitchen at the Columbia Division, from which the hospital was attempting to feed more than 3,000 patients with equipment designed to feed only 1,800…"
"The years 1951-1954 have been as a result the greatest period of sustained construction in the more than 125 years of the hospitals existance." "To replace the kitchen at the Columbia Division, from which the hospital was attempting to feed more…
These minutes go over some of the proposals and bids for materials of the buildings as well as how much time is still needed to finish the construction of the kitchen and dining halls.